Tuesday, May 17, 2011

COMPETENT CONTROL

[Pt. V-VI, S. 23-24]
28 ACT 447


PART V
COMPETENT CONTROL
23. (1) No installation or electrical plant equipment other
than those owned or managed by a supply authority shall be
worked or operated except by or under the control of persons
possessing such qualifications and holding such certificates
as may be prescribed, and no person not possessing the
qualifications or holding a certificate as aforesaid shall be
in charge of any installation or shall control the operation of
any electrical plant or equipment.
(2) Any person who contravenes this section shall be
guilty of an offence and shall, on conviction, be liable to
a fine not exceeding ten thousand ringgit and, if the
contravention be continued, to a fine not exceeding one
thousand ringgit for every day or part of a day during which
the contravention is continued after conviction.

competent person

"competent person" means a person who holds a certificate
of competency issued by the Director General to
perform work in accordance with the restrictions, if any,
stated in the certificate;

Sunday, May 1, 2011

Tmn Kumbar Permai - usul Telco Tower

MEMO


Tarikh: 29 April 2011

Kepada: Semua pemilik unit Taman Kumbar Permai,

Mesyuarat Agung Tahunan ke Dua JMB Taman Kumbar Permai - Usul

Merujuk kepada Usul Mesyuarat di atas yang di adakan pada 24hb April 2011, di perkarangan Blok 2 Taman Kumbar Permai.

6.3 En Abdul Rahman bin Osman (1-11-1)

Mengusulkan agar projek Panca Ulang Celcom yang tergendala di bincang semula agar semua penduduk mendapat manafaat, Harap dapat pertimbangan sewajarnya dari semua pihak.

Masyuarat post mortem peringkat AJK telah di adakan pada 26hb April 2011 dan telah memutuskan usul 6.3 En Abdul Rahman b. Osman (1-11-1) tidak dapat di pertimbangkan atas sebab sebab berikut:

1. Menghormati pendapat dan pandangan penduduk yang tidak setuju
2. Atas dasar semangat kejiranan yang telah terbina sekian lama
3. Menjaga keharmonian dan ketenteraman penduduk TKP secara keseluruhan
4. Untuk mengelakan ketegangan yang berlarutan dan berpanjangan

Dengan kenyataan ini, AJK JMB Taman Kumbar Permai menganggap isu tersebut telah selesai dan jika ada sebarang pertikaian selepas ini adalah di luar bidang kuasa JMB Taman Kumbar Permai.

Denga tulus hati dan rendah diri, AJK JMB Taman Kumbar Permai memaafkan dan memohon maaf apa jua kesilapan pada pihak kami juga pihak yang tidak setuju mahupun yang setuju. Kami tidak berupaya untuk memenuhi kehendak semua penduduk. Kami berharap semua penduduk TKP akan terus berganding bahu kearah pencapaian missi menjadikan TKP satu penempatan yang elit; seperti kata pepatah melayu “biduk berlalu kiambang bartaut’ dan “ringan sama di jinjing berat sama di pikul”


Sekian,


Yang Menurut Perintah,




______________________
KAMARUZAMAN BIN SURADI
Pengerusi, JMB Taman Kumbar Permai

Taman Kumbar Permai Auto Gate Barrier

MEMO


Tarikh: 25hb April 2011

Kepada: Semua pemilik unit Taman Kumbar Permai,


Sistem Halangan Otomatik (Auto Gate Barrier)

Untuk makluman, sistem gate halangan otomatik sedang mengalami kerosakan serius pada litar kawalan dan mekanikal. Kos untuk memperbaiki gate yang telah berusia hampir sepuluh tahun tesebut adalah terlalu tinggi dan tidak praktikal untuk di perbaiki.

Kerja kerja menaik taraf sedang dalam proses “cadangan dan bidaan” oleh kontraktor yang terpilih; di jangka proses pembidaan, pemilihan dan pemberian kontrak akan selesai tidak lama lagi dan kerja kerja menaik taraf tersebut akan bermula sekitar May 2011.

Untuk sebarang pertanyaan sila hubungi pejabat pengurusan.

JMB memohon maaf di atas sedikit kesulitan yang di alami demi untuk kebaikan besar masa hadapan. Kerjasama semua pemilik adalah amat di hargai.


“TELUS COMPETENT BERTANGGUNG JAWAP”


Yang Benar,




KAMARUZAMAN BIN SURADI
Pengerusi,
JMB Taman Kumbar Permai